Nightfall in Pooler: Many Stores are Open

Pooler CollageAs we near project close, several major retailers are open for business, including PetSmart, Kirkland’s, Hibbett and Rack Room Shoes. We anticipate that Michael’s will open on the 30th of this month, with T.J. Maxx following on April 27th and Ross Dress for Less in July. 

Petsmart/Kirklands Are Open

Pooler Collage 1 Pooler Collage 2

This week, we are really seeing the project come together. Petsmart and Kirkland’s are open for business, and final punch lists for Michaels, Ross and T.J. Maxx are  being worked through. Hibbets and Rack Room have almost completed their tenant finishes.

In Shops 1,  contractors for Kay’s Jewelers,  Palm Beach Tan, GameStop and GNC have started their build out.We are still waiting on permit for vanilla box in suite E.

In Shops 2, contractors for Legacy Nails, Sprint, Marble Slab Creamery and B&G Burgers are starting their build outs.  We have completed the Pad B building, and contractors for Aspen Dental and Vision Eyecare have started their build outs.  All paving and landscaping has been completed.

We’ve got Paint!

Pooler Collage 1Pooler collage 2

Week by week, we are seeing The Village on Pooler Parkway take shape. At Petsmart and Michael’s, exterior paint and interior tile work are in progress. Exterior fascia framing and cladding are complete at Ross Dress for Less, and MEP and interior wall framing are moving along. Structural steel and decking are almost complete at TJ Maxx. Exterior soffit work will start Monday.

At other locations around the site, we are seeing sidewalks poured and storefronts installed, along with additional MEP work. Irrigation systems, trees and sod have been installed on the west and north sides of the site.

Ready for Landscaping

Pooler Collage 1Pooler Collage 2

We’ve been busier than ever at The Village on Pooler Parkway, watching the site take more shape. At Petsmart & Michaels, interior framing and drywall installation is in progress. Our team has completed steel erection at Ross, and roofing installation is moving ahead. Buildings 4-5-6 are in the steel erection phase as well.

The underslab plumbing has been installed and inspected on Outparcel 1-A building. The installation gas line to the site and to each space is in progress. Landscaping is starting today.

Petsmart Taking Shape

At Petsmart, our team is working hard on exterior framing, roof drains and electrical rough-ins. We moved forward with Michaels steel erection, and all the slab leaveouts have been poured. The pouring and erection of walls and dock walls has been a primary task at Ross Dress for Less. We poured the slab for TJ Maxx and started tilt up panel layout. Sitework continues around the property.

Pooler Collage 1